PRECOMMISSIONING & COMMISSIONING METHOD STATEMENT PROCEDURE FOR CCTV SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “CCTV System”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements

2025
May
30

Method Statement for Earth Work Including the Preparation of Formation Level

Method Statement for Earth Work Including the Preparation of Formation Level

The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications.

2025
May
30

Testing & Commissioning Method Statement For Fire Fighting Pumps

Below is a complete step wise Testing & Commissioning Method Statement For Fire Fighting Pumps. The purpose of this procedure is to define the step by step method to implement the correct practices for the testing, precommissioning & commissioning of “Fire Fighting Pumps”

2025
May
25

Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m

2025
May
20

METHOD STATEMENT FOR PRECOMMISSIONING & COMMISSIONING OF CENTRAL BATTERY SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre commissioning & commissioning of “Central Battery System” CBS through the guidelines contained herein so as to ensure that the job execution complies