The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures
Read Full Method Statement
This page covers the method statement for the construction of plain cement concrete pavement in accordance with the drawings & specifications and in conformity with lines, grades and cross sections shown on the drawings. All the joint details shall be as per
Read Full Method Statement
Below is given a Safe work method statement for the installation of foundation waterproofing that can be applicable for safe working for any building or project construction. Ensure Material for water proofing material is approved prior to application. Ensure surface preparation is
Read Full Method Statement
The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in
Read Full Method Statement
Below is a simple to understand safe work method statement for the Demolition of Existing Boundary Wall before starting a new project or renovation works. No. Description of Activity Responsibility 1.0 Ensure all clearances from the concerned Government Department obtain PE/SE 2.0
Read Full Method Statement