Required Tools/Equipment Multimeter Detector Testing Tool Hilti Machine Drill Machine Pull string Step Ladders Mobile Scaffold Preparation Work Before Installation With the aid of computer software program design the system and prepare isometric drawing. Prepare layout drawing of piping network system and mechanical
Read Full Method Statement
1.0 PURPOSE The purpose of this method statement is to outline the method for handling, storage, installation, testing and commissioning for the Clean Agent System in accordance with the requirements specified in the relevant NFPA Codes, Standards and Project specifications in all
Read Full Method Statement
The purpose of this procedure is to define step by step the method for the precommissioning & commissioning of argonite fire suppression system. Testing and commissioning parameters shall be as per the specific project requirements, specifications and applicable local and international standards.