Below is given in steps the method Statement for Liquid Water proofing for Wet areas in a building project. Preparation for Work Clean all surfaces free of dust, laitance, foreign material etc, by stiff wire brushing. oil and grease should be cleaned
Read Full Method Statement
Instructions for the implementation of this SWMS: Review the SWMS on site with the relevant employees and contractors. Identify and document the high risk Construction Work to be performed. Identify and document the site PPE requirements for the task. Document any additional
Read Full Method Statement
Method Statement for installation / application of External Water Proofing Membrane for Swimming Pool and Water Tanks. Ensure Material for water proofing membrane approved prior to fixation. Membrane must be stored in shaded area with ambient temperature of less than 35 º
Read Full Method Statement
Below document covers FCU installation method statement that covers steps to install FCU units of ducted and DX type air conditioners. By following this HVAC method statement contractor shall ensure that the job execution complies with the project specification and manufacturer requirements
Read Full Method Statement
Below is a precise method statement for fire hose reel testing and commissioning part of project fire fighting system. Automatic wet system is a system that is attached to a water supply capable of supplying the system demand at all fires and
Read Full Method Statement