Purpose of this electrical procedure is to define the step by step method to implement the correct practices for the installation pre-commissioning & commissioning of electrical earthing system. Guidelines contained herein shall ensure that the job execution complies with the project requirements
Read Full Method Statement
This electrical method statement covers the installation of bus bar electrical assemblies. Following this procedure shall ensure that the installation has been carried out as per contract requirements and best practices. Method gives details of how the work will be carried out
Read Full Method Statement
This procedure covers installation & testing of access control system including readers, reader interfaces and accessories, to ensure the required quality control activities are done as per project specifications and client requirements. Method statement details the activities, procedure to follow, specialized tooling
Read Full Method Statement
Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor.
Read Full Method Statement
The purpose of this civil work method statement is to cover the activities involved in the fabrication and installation of the steel reinforcement rebar in the project considering the quality and safety requirements. Scope of the method statements covers the activation of
Read Full Method Statement