METHOD STATEMENT FOR PRECOMMISSIONING & COMMISSIONING OF CENTRAL BATTERY SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre commissioning & commissioning of “Central Battery System” CBS through the guidelines contained herein so as to ensure that the job execution complies

2015
Apr
25

PRECOMMISSIONING & COMMISSIONING METHOD STATEMENT PROCEDURE FOR CCTV SYSTEM

PURPOSE : The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “CCTV System”through the guidelines contained herein so as to ensure that the job execution complies with the project requirements

2015
Apr
23

Method Statement for Precommissioning & Commissioning of Bus Bar System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Bus Bar System”. Through the guidelines contained herein so as to ensure that the job execution complies with the

2015
Mar
21

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when