Before starting the Roof Steel Truss Installation necessary Scaffolding or working platform shall be provided with green tag to reach and work at the height safely. Marking of Layout: The base plate level and the center line of the Truss / Column shall
Read Full Method Statement
The purpose of this method statement is to describe the detailed procedure to be followed for the installation, testing and commissioning of Elevator (Lift) at the construction project site. This method statement is prepared also to ensure that concerned persons are familiar
Read Full Method Statement
This is best method statement for installation of Exterior Insulation Finishing System also called EIFS. Following materials shall be used for the typical installations. TERRACO STYROFIX: Styrofix is an adhesive for the TERRACO Exterior Insulating Finishing System (EIFS). It is easy to
Read Full Method Statement
Background Surface Preparation Conmix dressing plaster LC 11 is a pre mixed sand cement mortar for internal and external use. It is recommended as finishing coats/repairing coats on to Portland cement based background, or render surface. LC 11 is ideal material for
Read Full Method Statement
Below equipment’s & tools shall be arranged before starting the process of roof waterproofing works. Measuring tape Cylinder fed propane torch Heavy duty press rollers Cotton waste Paint roller and paint brush Paint roller and paint brush Heavy duty scissors Thinner or
Read Full Method Statement