Category Archives: Civil Method Statements

Chasing Work on Block Wall for PVC Conduits

Following tools shall be arranged before start of the Chasing Work on Block Wall for PVC Conduits. Necessary measures will be taken for the safety of the equipment and any other works affected by the works subject of this document. Mason Trowel Wheel Barrow Plumb Joint Filler Mortar mixer Mechanical Cutter Chisel Hammer Plaster mesh… Read More: Chasing Work on Block Wall for PVC Conduits »

GRP Fins Installation Method of Statement

Below is the method for the installation of GRP Fins. Before starting the installation work for GRP fins following equipment/tools shall be arranged: Tower crane chain block spanners hammers Hilti Machine Spirit level Water level Steps for GRP Fins Installation Scaffolding should be provided in the area where fins are to be erected. Starting point… Read More: GRP Fins Installation Method of Statement »

Epoxy Paint Application Method Statement Procedure

This document describes the methodology for the application of epoxy paint for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable safety and quality procedures, and project documents and specification. Necessary measures will be taken for… Read More: Epoxy Paint Application Method Statement Procedure »

Floating Floor System Installation Method Statement

This method statement is intended to outline the activities and the methods used for floating floor system for equipment’s like chillers etc. All activities will be carried out in accordance with the contract details and in full compliance to the Contract Specifications and Documents. All work within the rights-of-way of the local municipal governments will… Read More: Floating Floor System Installation Method Statement »

Tower Crane Erection and Dismantling Method Statement

Tower Crane Erection Sequence In the process of starting assembling lifting technician has to make sure that all lifting points are respected according to the manufacturer’s guideline, assembly sequence is clearly communicated by the lifting engineer to his crew. The site satisfies all requirements that are routed by the relevant safety standard and have passed… Read More: Tower Crane Erection and Dismantling Method Statement »