Category Archives: Civil Method Statements

Safe Work Method Statement for Civil Works for Swimming Pool

Below is the list of required tools which shall be arranged before start of civil works for swimming pool works. Plaster spray machine Aluminium rod for leveling, water level, split level Trowel Scrapper Roller Drill for mixing Rubber hammer Tile spacer Air blower Sponge bucket Asphalt burner for torching the membrane Method Statement for Civil… Read More: Safe Work Method Statement for Civil Works for Swimming Pool »

Safe Work Method Of Statement for Acoustic Fabric Panels Installation

1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance prior to start work. 2.0 Proper Scaffolding should be provided for tall walls. It should be inspected and approved by safety officer. 3.0 RFIA should be submitted and ensure its approval prior to start work. 4.0 Before Installation ensure wall is free from any… Read More: Safe Work Method Of Statement for Acoustic Fabric Panels Installation »

Safe Work Method Statement for Vinyl Flooring

Below is given the safe Method Statement for performing the installation of vinyl Flooring in simple steps. Selected working area should be barricaded to avoid accidents & damages and obtain necessary clearances  and approvals from Engineers including MEP clearance. Inspection request to be raised and ensure its approval prior to start vinyl flooring. Ensure the… Read More: Safe Work Method Statement for Vinyl Flooring »

Method Statement for Masonry Water Base & Emulsion Painting Works

1.0 Obtain necessary clearances and approvals from Engineers including MEP clearance 2.0 Proper Scaffolding should be provided for tall walls. It should be inspected and approved by safety officer 3.0 RFIA should be submitted and ensure its approval prior to start paint works 4.0 Concrete substrate must be dry, free from any dust, grease and… Read More: Method Statement for Masonry Water Base & Emulsion Painting Works »

Method Statement for Wood Paint for MDF Skirting

1.0 Obtain necessary clearances and approvals from civil engineers. 2.0 Inspection for clearance should be submitted and its approval to be ensured prior to start paint works. 3.0 Surface must be clean, dry, and from any dust. 4.0 Apply first coat using brush, roller or spray to achieve a uniform thickness as per manufacturers’ recommendations 5.0… Read More: Method Statement for Wood Paint for MDF Skirting »

Termite Treatment Safe Work Method Statement for Anti Termite

Safe Work Method Statement for Anti Termite Treatment is given below in a short form that contains only the steps involved in the activity. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents & damages Ensure suitable access / safe ramps provided for safety of all… Read More: Termite Treatment Safe Work Method Statement for Anti Termite »

Installation Method Statement For GRP Sectional Water Tanks

Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required… Read More: Installation Method Statement For GRP Sectional Water Tanks »