Category Archives: Civil Method Statements

Irrigation Pump Installation Method Statement

This document describes the methodology for the Installation of Irrigation pump for the project building to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. This method statement is intended to… Read More: Irrigation Pump Installation Method Statement »

Roof Steel Truss Installation Method of Statement

Before starting the Roof Steel Truss Installation necessary Scaffolding or working platform shall be provided with green tag to reach and work at the height safely. Marking of Layout: The base plate level and the center line of the Truss / Column shall be marked based on reference datum and coordinate points given by main contractor… Read More: Roof Steel Truss Installation Method of Statement »

Elevators Lifts Installation Method Statement Including Testing & Commissioning

The purpose of this method statement is to describe the detailed procedure to be followed for the installation, testing and commissioning of Elevator (Lift) at the construction project site. This method statement is prepared also to ensure that concerned persons are familiar with the sequence of activities, utilization of resources and relevant documents in compliance… Read More: Elevators Lifts Installation Method Statement Including Testing & Commissioning »

Method Statement for Installation of Exterior Insulation Finishing System (EIFS)

This is best method statement for installation of Exterior Insulation Finishing System also called EIFS. Following materials shall be used for the typical installations. TERRACO STYROFIX: Styrofix is an adhesive for the TERRACO Exterior Insulating Finishing System (EIFS). It is easy to use by just adding /mixing with water, improving on-site quality control. It shows… Read More: Method Statement for Installation of Exterior Insulation Finishing System (EIFS) »

Method Statement for Crack Repairing

Background Surface Preparation Conmix dressing plaster LC 11 is a pre mixed sand cement mortar for internal and external use. It is recommended as finishing coats/repairing coats on to Portland cement based background, or render surface. LC 11 is ideal material for dubbing out and leveling of backgrounds or as an thin coat plaster. The… Read More: Method Statement for Crack Repairing »