Category Archives: Civil Method Statements

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual project site requirements. The piles will be of a nominal specified diameter, bored… Read More »

Block Wall Construction Control Procedure for Blockwork

This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out in accordance with the project specifications. In any circumstance where specifications are not… Read More »

Slab Concrete Procedure for Ground Floor Slab

This civil construction procedure applies to insitu industrial ground floor slabs with a tolerance of± 3mm or tighter. Prior to placing subcontract concrete order check the specification to ensure the full extent of tolerances and surface finish is understood. Concrete pouring order to be placed only when all parties have agreed tolerances, method of checking… Read More »

Method Statement for Major and Minor Concrete Repair & Filling of Pinholes and Cracks

This repairing method statement applies to all concrete repair of the following types. Major Repair:  For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete repairs should be supervised by specialist personal. For all major concrete repair works… Read More »

Method of Statement for Construction Of Pilecap Foundations

This Method Statement outlines methodology and acceptable parameters for all activities for construction of Pile cap foundations for the project building. In addition this method covers types of plants and machinery, sequence and area of works, testing (Quality Control), health and safety. Plant and Machinery Excavator – 1 No. Crane – 1 No – wherever… Read More »