Basement MEP Coordination Shop Drawing Preparation and Checklist

Fire-Fighting-Sprinkler-System-method-statement-for-Testing and Commissioning

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for

2023
Apr
25

Installation Testing & Commissioning Method Statement for Earthing System

Installation Testing & Commissioning Method Statement for Earthing System

Purpose of this electrical procedure is to define the step by step method to implement the correct practices for the installation pre-commissioning & commissioning of electrical earthing system. Guidelines contained herein shall ensure that the job execution complies with the project requirements

2023
Apr
23

Electrical Busbar Assemblies Installation Method Statement

This electrical method statement covers the installation of bus bar electrical assemblies. Following this procedure shall ensure that the installation has been carried out as per contract requirements and best practices. Method gives details of how the work will be carried out

2023
Feb
5

ACS Access Control Electronic Security System Installation & Testing Method Statement

This procedure covers installation & testing of access control system including readers, reader interfaces and accessories, to ensure the required quality control activities are done as per project specifications and client requirements. Method statement details the activities, procedure to follow, specialized tooling

2019
Sep
21

Method of Testing & Commissioning of Structured Cabling System

Checklist for Testing & Commissioning of Structured Cabling System

The purpose of this method statement shall be to outline the sequence and method of Testing & Commissioning of Structured cabling system. This procedure is one component of a complete testing and commissioning program. This and other procedures will be used, as