Category Archives: Electrical Method Statements

Method Statement For Testing & Commissioning Of Disabled Toilet Alarm DTA System

The purpose of this method statement procedure is to define the step by step method to implement the correct practices for the testing, precommissioning & commissioning of “Disabled Toilet Alarm System“. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level.… Read More: Method Statement For Testing & Commissioning Of Disabled Toilet Alarm… »

Method Statement for Precommissioning & Commissioning of Bus Bar System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Bus Bar System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Below is list of… Read More: Method Statement for Precommissioning & Commissioning of Bus Bar System »

Safe Method Statement for the Fixation of Surveillance Camera

Procedure for installation or fixation of surveillance camera on a construction project site. This procedure is not for complete CCTV system instead should be taken as a temporary project monitoring camera used for surveillance of the project activities and security of the project assets. Ensure all clearances from the concerned government departments are obtained. Erection… Read More: Safe Method Statement for the Fixation of Surveillance Camera »

Light Fixture / Light Fittings Installation Method Statement

This method statement covers the Installation of Lighting Fixtures for any kind of building project including the external and internal lighting installation. Before start of light fittings installation electrical engineer will ensure that all wiring is complete, tested and approved from the client/consultant. Site is released/cleared from civil section to install light fittings and all… Read More: Light Fixture / Light Fittings Installation Method Statement »

SWMS Safe Work Method Statement for Electrical Conduit Installation Prior to Pouring Concrete

Instructions for the implementation of this SWMS: Review the SWMS on site with the relevant employees and contractors. Identify and document the high risk Construction Work to be performed. Identify and document the site PPE requirements for the task. Document any additional work methods, tasks and hazards identified on site and the control measures required… Read More: SWMS Safe Work Method Statement for Electrical Conduit Installation Prior… »

Basement MEP Coordination Shop Drawing Preparation and Checklist

The purpose of preparing the basement MEP coordination drawings is to prevent the clashing of MEP services during the execution of MEP works at a construction project site. Also to prevent the MEP service form coming below the Minimum clearance required for the cars in the driveway and parking as per the requirements of the… Read More: Basement MEP Coordination Shop Drawing Preparation and Checklist »

Installation Testing & Commissioning Method Statement for Earthing System

Purpose of this electrical procedure is to define the step by step method to implement the correct practices for the installation pre-commissioning & commissioning of electrical earthing system. Guidelines contained herein shall ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. The earthing system consists of… Read More: Installation Testing & Commissioning Method Statement for Earthing System »