2015
Apr
27

Method Of Statement For Precommissioning & Commissioning of Chiller Plant Manager

PURPOSE : The purpose of this safe work method statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Chiller Plant Manager or CPM”. Through the guidelines contained herein so as to ensure that

2015
Apr
25

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR VAVs & CAVs

Pre-Commissioning Procedure for VAVs / CAVs Ensure that the VAVs / CAVs installation is complete & mechanical completion is approved. Ensure that the VAVs with 12 point flow cross type of averaging air flow sensor installed as per approved drawings. Ensure that no damage

2015
Apr
23

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR BUILDING MANAGEMENT SYSTEM BMS

The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Building Management System“. Through the guidelines contained herein so as to ensure that the

2015
Apr
23

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project

2015
Mar
21

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when