2025
Jul
5

Pipe Welding Procedure

The purpose of this method statement / pipe welding procedure is to define and outline proposals for carrying out the welding & installation of MS piping System. Method is applicable to all ERW, Black Steel, Schedule 40, Grade ‘B’ and fittings, in

2025
May
25

Safe Work Method Of Statement For Dewatering Work

This Method Statement provides the control sequence of construction and methodology that will be used for the supply, installation and maintenance of dewatering system over the entire project at any stage based on the following data: Required Data:  Water Table level :  m

2025
May
19

Method Statement For Testing & Commissioning Of Electric Water Heaters

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Electric Water Heater”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements

2025
Feb
21

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when

2025
Jan
1

Excavation Method Statement

Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept