List of tools required for VESDA system testing and commissioning which should be arranged before starting the work. Portable Hand tools Step Ladder Insulation Resistance Tester Continuity tester Precommissioning Procedure for VESDA System Check the location of installation of the panel is
Read Full Method Statement
The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution
Read Full Method Statement
Below is a step wise method of statement for Testing & Commissioning of Sump Pump Sets. Precommissioning Procedure for Sump Pumps Ensure that the pump installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Repair all
Read Full Method Statement
The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies
Read Full Method Statement