The purpose of this safework method statement is to define the rules and conditions designed to ensure that concrete and paving demolition work is planned so as to enable personnel to be aware of all the procedures and dangers involved and to
Read Full Method Statement
Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual
Read Full Method Statement
This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out
Read Full Method Statement
This civil construction procedure applies to insitu industrial ground floor slabs with a tolerance of± 3mm or tighter. Prior to placing subcontract concrete order check the specification to ensure the full extent of tolerances and surface finish is understood. Concrete pouring order
Read Full Method Statement
Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work:
Read Full Method Statement