Synthetic Natural Gas SNG System Installation Method Statement

Below is the list of tools and equipment that shall be required for installation of Synthetic Natural Gas SNG System. Pipes and Tubes Cutter Arc Welding Machine Oxygen and Acetylene set Calibrated Pressure Gauges Standard Tool Kit for Welder Standard Tool Kit for Welding and Brazing Hand Tools (Wrenches) Pressure Testing Pump Pre Requirements Check… Read More »

Elevators Lifts Installation Method Statement Including Testing & Commissioning

The purpose of this method statement is to describe the detailed procedure to be followed for the installation, testing and commissioning of Elevator (Lift) at the construction project site. This method statement is prepared also to ensure that concerned persons are familiar with the sequence of activities, utilization of resources and relevant documents in compliance… Read More »

Method Statement for Installation of Exterior Insulation Finishing System (EIFS)

This is best method statement for installation of Exterior Insulation Finishing System also called EIFS. Following materials shall be used for the typical installations. TERRACO STYROFIX: Styrofix is an adhesive for the TERRACO Exterior Insulating Finishing System (EIFS). It is easy to use by just adding /mixing with water, improving on-site quality control. It shows… Read More »

Method Statement for Crack Repairing

Background Surface Preparation Conmix dressing plaster LC 11 is a pre mixed sand cement mortar for internal and external use. It is recommended as finishing coats/repairing coats on to Portland cement based background, or render surface. LC 11 is ideal material for dubbing out and leveling of backgrounds or as an thin coat plaster. The… Read More »