This method statement is intended to outline the activities and the methods used for floating floor system for equipment’s like chillers etc. All activities will be carried out in accordance with the contract details and in full compliance to the Contract Specifications
Read Full Method Statement
Tower Crane Erection Sequence In the process of starting assembling lifting technician has to make sure that all lifting points are respected according to the manufacturer’s guideline, assembly sequence is clearly communicated by the lifting engineer to his crew. The site satisfies
Read Full Method Statement
This document describes the methodology for the Installation of Irrigation pump for the project building to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and
Read Full Method Statement
Prior to acceptance and initial operation, all piping installations shall be inspected and pressure tested to determine that the materials, design, fabrication, and installation practices comply with the requirements of this code. Inspection shall consist of visual examination, during or after manufacture,
Read Full Method Statement
Below is the list of tools and equipment that shall be required for installation of Synthetic Natural Gas SNG System. Pipes and Tubes Cutter Arc Welding Machine Oxygen and Acetylene set Calibrated Pressure Gauges Standard Tool Kit for Welder Standard Tool Kit
Read Full Method Statement