INSTALLATION OF DRAINAGE,RAIN WATER & CONDENSATE DRAIN PIPE WORK On receipt of Drainage & rain water pipes & fittings , the materials shall be handled & stored in line with the following procedure: Pipes will be stacked on a flat surface free from sharp
Read Full Method Statement
The purpose of this Method Statement is to define the procedure step by step to implement the correct practices for installation of sprinkler & fire fighting pipework & accessories through the guidelines contained herein so as to ensure that the job execution complies
Read Full Method Statement
Below equipment’s & tools shall be arranged before starting the process of roof waterproofing works. Measuring tape Cylinder fed propane torch Heavy duty press rollers Cotton waste Paint roller and paint brush Paint roller and paint brush Heavy duty scissors Thinner or
Read Full Method Statement
Required tools & equipment: Following tools or equipment’s shall be arranged: Seam sealer & Edge sealer Cushion back cutter or top cutter Notched trowel 50-75 lb. roller Mini or crab stretcher and power stretcher Knee kicker Straight edges Razor knives Hammer Stay nails,
Read Full Method Statement
Necessary equipment & tools: Following tools shall be arranged before installation works: Squeegee Roller Brush Level Machine Sanding machine Hammer Drill machine Screw Drivers Method Statement for Wooden Flooring Installation Obtain necessary clearances and approvals from Engineers including MEP clearance. Inspection request should
Read Full Method Statement