Method Statement for Piling Work using the Diesel Hammer

Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor. The surveyor will also be responsible for accurate survey location during erection and… Read More »

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual project site requirements. The piles will be of a nominal specified diameter, bored… Read More »