2015
Aug
6
Method Statement For Installation Of Transformers
![](https://safeworkmethodofstatement.com/wp-content/uploads/2015/08/installation-of-electrical-transformers.jpg)
Following tools shall be arranged before starting the process of installation of transformer. Fork Lift or Crane, pallet mover with capacity & arrangement in line with the Manufacturer’s recommendations and as required at site. Portable hand tools. Portable Drilling Machine/ Grinding Machine &