This procedure or method statement covers the precommissioning & commissioning of individual chiller units only. The complete sequence of operation including the precommissioning & commissioning of Chiller Plant Manager is covered separately. Precommissioning Procedure for Chillers Ensure that the chiller installation is complete and
Read Full Method Statement
PURPOSE : The purpose of this safe work method statement procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Chiller Plant Manager or CPM”. Through the guidelines contained herein so as to ensure that
Read Full Method Statement
The purpose of this safework method statement is to establish the work method for supply and installation of mild steel pipes, fittings and pipe works under the water reticulation work for project buildings, landscape, infrastructure and associated works. Upon delivery at site,
Read Full Method Statement
Required tools & equipment: Following tools or equipment’s shall be arranged: Seam sealer & Edge sealer Cushion back cutter or top cutter Notched trowel 50-75 lb. roller Mini or crab stretcher and power stretcher Knee kicker Straight edges Razor knives Hammer Stay nails,
Read Full Method Statement
Below is detailed mechanical method statement that provides steps for the cleaning, flushing and passivation of chilled water pipe system Objectives of chemical flushing for chilled water system is to remove debris such as slit, sand, scale, iron oxide deposits, weld slug
Read Full Method Statement