2022
Feb
14

Construction of Bored Cast-in-Situ Piles Best Method Statement

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual

2022
Jan
18

Block Wall Construction Control Procedure for Blockwork

Block Wall Construction Control Procedure for Blockwork

This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out

2021
Dec
13

Construction Vehicle and Plant Servicing Procedure

Construction Vehicle and Plant Servicing Procedure

Below are some guidelines to establish set of rules for safely carrying out general construction vehicle and plant service works. Project manager and plant and machinery incharge are responsible for the implementation of this standard procedure. Before start of the servicing work:

2021
Nov
21

Drainage Piping Above Ground Installation Plumbing Work Method of Statement

Installation and Testing of Above Ground Drainage Piping

This method statement describes the procedure for installation of above ground drainage piping system. Document applies to the inward site inspection, installation and inspection methods to be adopted for the above ground drainage piping system. Project manager is overall responsible for the