This procedure describes the requirements on emergency preparedness and responses to ensure prompt and safe action in case of any emergency or disaster situation. This procedure applies to all health, safety and environmental emergencies with a particular emphasis to the requirements in
Read Full Method Statement
Before implementing this or any SWMS it must be checked and adjusted to suit a person’s individual work method, as long as hazards are identified and controlled. You may need to add additional steps to suit particular work environments and circumstances. The
Read Full Method Statement
Purpose: To control and provide guidance for the management of flammable liquids which are increasingly being used on construction sites. Definitions and Abbreviations Flammable Liquids: Defined as those that have a flash point of less than 32°C and supporting combustion at 50°C. Flammable
Read Full Method Statement
Unless otherwise specified, all close control unit installation shall be in accordance to approved shop drawings and contract specifications, drawing plans, schematics, and diagrams indicate general location and arrangement of closed control unit. The Project Manager is the overall responsible person for
Read Full Method Statement
PPE stands for personal protective equipment and defined in the Regulations as all equipment (including clothing affording protection against the weather) which is intended to be worn or held by a person at work and which protects him against one or more
Read Full Method Statement