2020
Jan
17

Safe Work Method Statement for Excavation of Trenching

Excavation or Trenching Safe Work Method Statement

Main contractors will conduct inductions for all workers (inclusive of employees and subcontractors) prior to commencing site work. A record of site inductions and toolbox meetings will be kept at the contractors office for future reference. The contractor or client will provide

2020
Jan
5

Sanitary Wares Installation & Inspection Method of Statement

Sanitary Wares Installation Instruction and checklist

This document defines the methods to use to ensure that the works at construction site are in compliance with the approved designs and approved materials. This method statement describes the procedure for installation of sanitary wares. Scope of Document This document applies

2019
Oct
21

Use of Series and Shunt Capacitors in Transmission Lines

Let’s first understand the effect of power factor on the power system. The power factor of an AC electric power system is defined to be; Power factor = π‘Ÿπ‘’π‘Žπ‘™ π‘π‘œπ‘€π‘’π‘Ÿ / π‘Žπ‘π‘π‘Žπ‘Ÿπ‘’π‘›π‘‘ π‘π‘œπ‘€π‘’π‘Ÿ Real power is the capacity of the circuit for

2019
Sep
21

Method of Testing & Commissioning of Structured Cabling System

Checklist for Testing & Commissioning of Structured Cabling System

The purpose of this method statement shall be to outline the sequence and method of Testing & Commissioning of Structured cabling system. This procedure is one component of a complete testing and commissioning program. This and other procedures will be used, as