This document applies to the inward site inspection, installation and inspection methods to be adopted for the underground drainage piping system. The work methods are summarized as follows: Mandatory Equipment Required Measuring tape and setting out markers Electric drill hammer Hack saw
Read Full Method Statement
In order to do the honeycomb concrete repair work for structural element all necessary machines and tools shall be arranged like mixer machine, wheelbarrows, wire brush, angle grinder, measuring tapes, and other handy tools. Below is the repairing material for reference purpose,
Read Full Method Statement
Safe Work Method Statements – SWMS What is a SWMS? SWMS is document detailing how a particular task or activity will be carried out, including required resources, responsibilities, quality and HSE requirements etc. What is the purpose of SWMS? To outline a
Read Full Method Statement
Following tools shall be arranged before start of the Chasing Work on Block Wall for PVC Conduits. Necessary measures will be taken for the safety of the equipment and any other works affected by the works subject of this document. Mason Trowel
Read Full Method Statement
Below is the method for the installation of GRP Fins. Before starting the installation work for GRP fins following equipment/tools shall be arranged: Tower crane chain block spanners hammers Hilti Machine Spirit level Water level Steps for GRP Fins Installation Scaffolding should
Read Full Method Statement