This procedure covers installation & testing of access control system including readers, reader interfaces and accessories, to ensure the required quality control activities are done as per project specifications and client requirements. Method statement details the activities, procedure to follow, specialized tooling
Read Full Method Statement
Driven pile is selected for part of the foundation system. The specification of the driven pile system using Diesel Hammer is according to client requirements. Positioning/setting out of the driven pile points will be performed using Total Station by a qualified surveyor.
Read Full Method Statement
The purpose of this civil work method statement is to cover the activities involved in the fabrication and installation of the steel reinforcement rebar in the project considering the quality and safety requirements. Scope of the method statements covers the activation of
Read Full Method Statement
The installation of sheet piles are the famous type of temporary works for the construction of building or bridge during foundation works such as pilecap structural. Steel sheet piles are long structural sections with a vertical interlocking system that creates a continuous
Read Full Method Statement
The purpose of this civil work method of statement is to define the procedures to ensure that the proposed materials and workmanship to be used at the site are complying with the condition / requirements as stipulated in the project earthwork specifications.