This procedure describes the process of piling 24 inch and install sheet pile on the work project. Barge master shall be responsible to position the crane barge on piling area. Supervisor is responsible to install pile and sheet pile from beginning to
Read Full Method Statement
This method statement is intended to outline the activities and the method for the Telescopic seating for auditorium or stadium seats, also known as retractable seating system. All activities will be carried out in accordance with the contract details and in full compliance
Read Full Method Statement
This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure & decking slabs. The procedure shall be read in conjunction with contract specification wherever applicable. Purpose of this procedure is to define fabrication and installation of
Read Full Method Statement
In order to do the honeycomb concrete repair work for structural element all necessary machines and tools shall be arranged like mixer machine, wheelbarrows, wire brush, angle grinder, measuring tapes, and other handy tools. Below is the repairing material for reference purpose,
Read Full Method Statement
Following tools shall be arranged before start of the Chasing Work on Block Wall for PVC Conduits. Necessary measures will be taken for the safety of the equipment and any other works affected by the works subject of this document. Mason Trowel
Read Full Method Statement