2015
Jun
6

Method Statement For Installation Of Central Battery System CBS & Panels

Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material  On receipt of

2015
Jun
6

Testing & Commissioning Of UPS System – Method Statement

The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to

2015
Jun
6

Method Statement For Fluke Testing & Commissioning Of Telephone Data System

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution

2015
Jun
2

Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s

The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels  Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies

2015
May
31

Testing & Commissioning Of Submain Distribution Boards SMDB’s

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the