Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material On receipt of
Read Full Method Statement
The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution
Read Full Method Statement
The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies
Read Full Method Statement
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the
Read Full Method Statement