This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe
Read Full Method Statement
This document defines the methods to use to ensure that the works at construction site are in compliance with the approved designs and approved materials. This method statement describes the procedure for installation of sanitary wares. Scope of Document This document applies
Read Full Method Statement
This document applies to the inward site inspection, installation and inspection methods to be adopted for the underground drainage piping system. The work methods are summarized as follows: Mandatory Equipment Required Measuring tape and setting out markers Electric drill hammer Hack saw
Read Full Method Statement
This document describes the methodology for the Installation of Irrigation pump for the project building to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and
Read Full Method Statement
Prior to acceptance and initial operation, all piping installations shall be inspected and pressure tested to determine that the materials, design, fabrication, and installation practices comply with the requirements of this code. Inspection shall consist of visual examination, during or after manufacture,
Read Full Method Statement