2020
Oct
26

Supplier and Subcontractor HSE Monitoring & Management Procedure

Supplier and Subcontractor HSE Monitoring & Management Procedure

To ensure that selected subcontractors and suppliers are aware of their HSE obligations prior to commencing work on controlled workplaces or projects. This procedure will help to comply and fulfil the subcontractor health and safety responsibilities. Equipment: Includes all portable, semi portable

2020
Oct
2

Job Safety Analysis – Sample JSEA Job Safety & Environmental Analysis Format Download

Below is a template given for use on a construction project. Many organizations in place of risk assessment use job safety and environmental analysis which serves the same purpose. At the end of this page we have given the link to download

2020
Sep
4

Construction Method of Statement for Post Tension PT Slab Works

This construction method statement details general PT slab procedure to follow for Post Tension Works for slabs at any kind of civil construction project. PT slab method of statement covers the works of the post tension from placing of the ducts to

2020
Aug
11

Concrete Slope Protection Standard Requirements & Specifications

This standard specification covers below: Excavating and grading to the required grades and limits as shown on the Drawings and as described in this Specification; Supply and placement of geotextile; Supply and placement of granular backfill to the required grades and limits