Category Archives: Technical Guides

Supplier and Subcontractor HSE Monitoring & Management Procedure

To ensure that selected subcontractors and suppliers are aware of their HSE obligations prior to commencing work on controlled workplaces or projects. This procedure will help to comply and fulfil the subcontractor health and safety responsibilities. Equipment: Includes all portable, semi portable equipment, and hand tools, mobile and fixed plant. Subcontractor: A person/company contracted to… Read More: Supplier and Subcontractor HSE Monitoring & Management Procedure »

Job Safety Analysis – Sample JSEA Job Safety & Environmental Analysis Format Download

Below is a template given for use on a construction project. Many organizations in place of risk assessment use job safety and environmental analysis which serves the same purpose. At the end of this page we have given the link to download JSEA full template in editable word .doc format. JSA meaning in safety is… Read More: Job Safety Analysis – Sample JSEA Job Safety & Environmental… »

Construction Method of Statement for Post Tension PT Slab Works

This construction method statement details general PT slab procedure to follow for Post Tension Works for slabs at any kind of civil construction project. PT slab method of statement covers the works of the post tension from placing of the ducts to the final stressing and grouting. Separate method statements are available for the works… Read More: Construction Method of Statement for Post Tension PT Slab Works »

Concrete Slope Protection Standard Requirements & Specifications

This standard specification covers below: Excavating and grading to the required grades and limits as shown on the Drawings and as described in this Specification; Supply and placement of geotextile; Supply and placement of granular backfill to the required grades and limits as shown on the drawings and as described in this Specification; Supply and… Read More: Concrete Slope Protection Standard Requirements & Specifications »

Safe Work Method of Statement SWMS For The Blinding Concrete (PCC) Works

The purpose of this safe work method statement is to define the blinding concrete (PCC) works as per the requirements of specification and drawings, considering all the necessary safety and quality aspects of the work activities. This scope of works is for blinding concrete works under pile caps and all types of foundations for the… Read More: Safe Work Method of Statement SWMS For The Blinding Concrete… »

Rock Blasting Breaking and Mining Methods

This safe work method statement provides the details of the materials, equipment, procedures and relevant documents related to the Rock Blasting activity, including the quality control verification, the measurement verification, and also the safety precautions to be implemented for this work. The location of the rock blasting works will be limited to selected areas bound… Read More: Rock Blasting Breaking and Mining Methods »

Sample HSE Safety Committee Meeting Agenda & Reporting

Safety committee plays an important role in implementation of an organization’s or project’s hse system. Regular hse meeting is necessary to check the performance of a project or company. Below is list of some important safety meeting agenda points that you can consider if planning your next meeting. Normally the frequency of hse meeting is… Read More: Sample HSE Safety Committee Meeting Agenda & Reporting »