This standard specification covers below: Excavating and grading to the required grades and limits as shown on the Drawings and as described in this Specification; Supply and placement of geotextile; Supply and placement of granular backfill to the required grades and limits
Read Full Method Statement
The purpose of this safe work method statement is to define the blinding concrete (PCC) works as per the requirements of specification and drawings, considering all the necessary safety and quality aspects of the work activities. This scope of works is for
Read Full Method Statement
This safe work method statement provides the details of the materials, equipment, procedures and relevant documents related to the Rock Blasting activity, including the quality control verification, the measurement verification, and also the safety precautions to be implemented for this work. The
Read Full Method Statement
Safety committee plays an important role in implementation of an organization’s or project’s hse system. Regular hse meeting is necessary to check the performance of a project or company. Below is list of some important safety meeting agenda points that you can
Read Full Method Statement
PPE stands for personal protective equipment and defined in the Regulations as all equipment (including clothing affording protection against the weather) which is intended to be worn or held by a person at work and which protects him against one or more
Read Full Method Statement