Light Fixture / Light Fittings Installation Method Statement

This method statement covers the Installation of Lighting Fixtures for any kind of building project including the external and internal lighting installation. Before start of light fittings installation electrical engineer will ensure that all wiring is complete, tested and approved from the client/consultant. Site is released/cleared from civil section to install light fittings and all… Read More »

Confined Space Working Method Statement – Occupational health and safety Procedure

This method statement covers working inside confined space for MEP and civil works for any kind of project. Project health and safety team is responsible for implementation of below method in order to ensure that all workers are safe while working inside the confined spaces. Safety officer / in-charge will organize and conduct necessary periodic… Read More »

Safety Requirements for Installation of Upper Floor Wall Frames

The sub-contractor doing the upper floor wall frames installation is responsible for carrying out particular actions, as listed in this risk assessment document, complying the control measures. Supervisor is responsible to ensure that the sub-contractor is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the extent necessary, to… Read More »

Concrete Pavement Method Statement

This page covers the method statement for the construction of plain cement concrete pavement in accordance with the drawings & specifications and in conformity with lines, grades and cross sections shown on the drawings. All the joint details shall be as per the approved working drawing. Concrete pavement installations shall be done in compliance with… Read More »

Safe work method statement for the installation of foundation waterproofing

Below is given a Safe work method statement for the installation of foundation waterproofing that can be applicable for safe working for any building or project construction. Ensure Material for water proofing material is  approved prior to application. Ensure  surface preparation is approved  prior to start procedure for waterproofing application. Ensure that chamfer at foundations… Read More »