PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR BUILDING MANAGEMENT SYSTEM BMS

The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Building Management System“. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves …

Read More »

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory …

Read More »

Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This Section includes all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when so requested by the Consultant. Specific mounting arrangements …

Read More »

Specification for Installation Method Statement of Pipe Hangers & Supports

PART-1 GENERAL: WORK INCLUDED: Compliance with relevant General Requirements of Mechanical Services. 1.2 DESCRIPTION OF WORK: This Section includes piping supports complete for all piping systems except as otherwise specifie. 1.3 Reference Standards. Heating & Ventilating Contractors Association recommendations BS 3974 Specification for pipe supports ASME code of pressure piping B1.0 Manufacturers Standardization …

Read More »