Argonite Fire Suppression System Testing & Commissioning Method Statement

The purpose of this procedure is to define step by step the method for the precommissioning & commissioning of argonite fire suppression system. Testing and commissioning parameters shall be as per the specific project requirements, specifications and applicable local and international standards. By implementing below guidelines the contractor shall ensure that the job execution complies… Read More: Argonite Fire Suppression System Testing & Commissioning Method Statement »

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Automatic… Read More: PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM »

Excavation Method Statement

Below is excavation swms safe work method statement for performing the excavation work for different purposes like piping, service trenches, manhole and cable laying including building construction work etc. The procedure is given in main steps and other considerations must be kept in the view. This method statement covers general excavation works for foundations and… Read More: Excavation Method Statement »

Safe Work Method Statement For Back Filling Of Excavated Area / Trench

Safe work method statement for back filling of the excavation area is provided in steps as below. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents. Ensure suitable access / safe ramps provided for safety of all site personnel’s proper safety PPE to be followed. Place… Read More: Safe Work Method Statement For Back Filling Of Excavated Area… »

Site Preparation Land Clearing Method Statement

Table of Content General Construction Sequence List of Equipment List of Manpower Construction Method HSE Control Quality Assurance GENERAL Site preparation is one of the preliminary works to be done for starting construction works. The selected construction site preparation need to be completed properly before the start of construction process. Following factors are considered for… Read More: Site Preparation Land Clearing Method Statement »