Dozer Operation – Construction Equipment Safety Procedure

The purpose of this standard construction equipment safety procedure is to provide safe operating instructions for dozer operators working on any kind of construction or road projects. Project director is overall responsible for the implementation of this standard procedure. Authority to Operate a) All dozer operators must: i. hold a valid, project and equipment specific… Read More »

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.… Read More »

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual project site requirements. The piles will be of a nominal specified diameter, bored… Read More »

Block Wall Construction Control Procedure for Blockwork

This civil work instruction procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contractual project specifications and construction drawings for block work. All precast concrete masonry block work will be carried out in accordance with the project specifications. In any circumstance where specifications are not… Read More »