Use of Series and Shunt Capacitors in Transmission Lines

Let’s first understand the effect of power factor on the power system. The power factor of an AC electric power system is defined to be; Power factor = 𝑟𝑒𝑎𝑙 𝑝𝑜𝑤𝑒𝑟 / 𝑎𝑝𝑝𝑎𝑟𝑒𝑛𝑡 𝑝𝑜𝑤𝑒𝑟 Real power is the capacity of the circuit for performing work in a particular time. Apparent power is the product of the… Read More »

Method of Testing & Commissioning of Structured Cabling System

The purpose of this method statement shall be to outline the sequence and method of Testing & Commissioning of Structured cabling system. This procedure is one component of a complete testing and commissioning program. This and other procedures will be used, as needed, to provide assurance that testing activities are being conducted as required by… Read More »

Construction Methodology for Telescopic Seating System

This method statement is intended to outline the activities and the method for the Telescopic seating for auditorium or stadium seats, also known as retractable seating system. All activities will be carried out in accordance with the contract details and in full compliance to the contract specifications and project documents. All work within the rights-of-way of… Read More »

Steel Structure Fabrication and Metal Roofing Method Statement

This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure & decking slabs. The procedure shall be read in conjunction with contract specification wherever applicable. Purpose of this procedure is to define fabrication and installation of steel structure and roof that shall be carried out under controlled conditions. Responsibility… Read More »