Installation Method Statement For GRP Sectional Water Tanks

Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required… Read More »

METHOD STATEMENT FOR INSTALLATION OF FIRE HOSE CABINETS, HOSE RACK, HOSE REEL & EXTINGUISHERS

METHOD STATEMENT FOR INSTALLATION OF FIRE HOSE CABINETS, HOSE RACK, HOSE REEL & EXTINGUISHERS. Following tools shall be required for the installation of hose reel cabinets/racks and extinguishers. Portable Hand tools Portable Drill machines Portable Grinding machine Gas Cutting set Welding machine Pipe grooving machine Pipe threading machine HANDLING & STORAGE OF MATERIALS On receipt… Read More »

Method Statement For Installation Of Firefighting Pump Set

Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at site. On the floor, Fire Fighting pumps will be stored in a clean,… Read More »

Method Statement For Installation Of Steam Boilers

Following tools or equipment shall be arranged for the installation of steam boiler. Fork lift or Crane with capacity & arrangement ( strap ) in line with manufacturer’s recommendations. Portable hand tools, Spirit Level / Level Threads Drill Machine / Hammering Machine MATERIAL HANDLING & STORAGE On receipt of the Steam Boilers and accessories at site,… Read More »

Method Statement for the Installation of Calorifier

Below is step wise procedure or method statement for the installation of calorifier. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are… Read More »