Safe Work Method Statement for Anti Termite Treatment is given below in a short form that contains only the steps involved in the activity. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents
Read Full Method Statement
Below is a brief method statement for installation & testing of Liquefied Petroleum Gas LPG Piping System including the tank. LPG System shall be installed & tested by specialist supplier approved for the project. Ensure all civil works are completed for the
Read Full Method Statement
Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to
Read Full Method Statement
METHOD STATEMENT FOR INSTALLATION OF FIRE HOSE CABINETS, HOSE RACK, HOSE REEL & EXTINGUISHERS. Following tools shall be required for the installation of hose reel cabinets/racks and extinguishers. Portable Hand tools Portable Drill machines Portable Grinding machine Gas Cutting set Welding machine
Read Full Method Statement
Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at
Read Full Method Statement