Method Statement & Specifications For Mechanical Sound, Vibration & Seismic Control Installations

DESCRIPTION OF WORK This specification covers all sound & vibration isolators for mechanical equipment to prevent the transmission of vibration and mechanically transmitted sound to the building structure. It also includes adjusting each mounting system, and measurement of isolator system performance when

2025
Jan
7

PRECOMMISSIONING & COMMISSIONING PROCEDURE FOR AUTOMATIC CHEMICAL DOSING SYSTEM

The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of “Automatic Chemical Dosing System”. Through the guidelines contained herein so as to ensure that the job execution complies with the project

2023
Nov
20

FCU Installation Method Statement ( Split Units Ducted & DX Type)

Ducted-Split-Units-DX-Installation-method-of-statement

Below document covers FCU installation method statement that covers steps to install FCU units of ducted and DX type air conditioners. By following this HVAC method statement contractor shall ensure that the job execution complies with the project specification and manufacturer requirements