Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders
Below is a complete Method Statement For Installation of Cable Tray, Trunking, & Cable Ladders in compliance with project specifications and approved material submittals. Tool Required: Portable hand tools Portable Drilling Machine/ Grinding Machine Jigsaw Machine Spirit Level Level Threads Material Handling & Storage On receipt of the cable tray, trunking, cable ladder and accessories at…
-
Method Statement For Installation Of Central Battery System CBS & Panels
Following tools shall be required for installation of central battery emergency lighting system and CBS Panels. Fork Lift Hydraulic Pallet Mover Portable hand tools. Spirit Level / Level Threads Digital multi meter Megger Handling & Storage Of Received Material On receipt of the Central Battery System and accessories at site, necessary precautions shall be taken for…
-
Testing & Commissioning Of UPS System – Method Statement
The UPS System located normally in the LV rooms supports critical telephone & data room sockets, central equipment in the BMS, Server and security rooms etc. for a period of 30 minutes until power is restored. The UPS system provides continuous, regulated AC power to the loads under normal and abnormal conditions, including loss of the utility AC power.…
-
Method Statement For Fluke Testing & Commissioning Of Telephone Data System
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution complies with the project requirements and serves the intended function to satisfactory level of…
-
Method Statement For Testing & Commissioning of Smoke Extract Fans
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Smoke Extract Fans through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Smoke Extract…
-
Method Statement For Testing & Commissioning of Sanitary Wares
This method statement is to define the step by step procedure to implement the correct practices for the precommissioning & commissioning of Sanitary wares through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Sanitary wares Ensure that the…
-
Method Statement For Electrical Testing & Commissioning [LV Switchgear Panels]
The purpose of this method statement for electrical testing and commissioning is to explain step by step method to implement the correct practices for the precommissioning, testing & commissioning of “LV Switchgear” through the guidelines. In addition to below precise method of statement, you can find many electrical and ELV system testing and commissioning method statements…
-
Method Statement For Testing & Commissioning Of Leak Detection System
The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Leak Detection System through the guidelines contained herein. Ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Tools & Equipment Required: Portable Hand tools…
-
Method Statement For Testing & Commissioning of Fresh Air Handling Units FAHUs with Heat Recovery Wheel System
The purpose of this procedure is to define the step by step method to implement the correct practices for the testing, pre-commissioning & commissioning of Fresh Air Handling Units FAHUs with Heat Recovery Wheel System through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended…
-
METHOD STATEMENT FOR PRECOMMISSIONING & COMMISSIONING OF EXTRACT FANS
The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Extract Fans through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Pre-commissioning Procedure for Extract Fans: Ensure…