Step wise guide on how to install resin flooring method statement is given below:
| No. | Description of Activity | Responsibility |
| 1.0 | Obtain necessary clearances and approvals from Engineers including MEP clearance for existing underground utilities | MEP/PE/SE |
| 2.0 | Selected working area should be barricaded to avoid accidents & damages | PE/Safety Officer |
| 3.0 | Surface that will receive the resin flooring should be cleaned thoroughly and any dust or debris should be removed | PE/SE |
| 4.0 | RFIA to be submitted prior to start work | QC/PE/SE |
| 5.0 | Ensure surface has a level finish | PE/SE |
| 6.0 | Prime the surface using Polpox PRA25 primer | PE/SE |
| 7.0 | Allow drying time approximately 4 hours | PE/SE |
| 8.0 | One the primer has dried coat Polpox 814 is applied using squeegee/ trowel manually to an approximate thickness o 1.5 mm | PE/SE |
| 9.0 | Allow final dry time as per manufacturer’s recommendation | PE/SE |
| 10.0 | Inspcetion request to be submitted after completion of works and to ensure its approval. | QC/PE/SE |
