This safework procedure helps to provide guidance in carrying out the necessary measures to avoid flooding during testing and commissioning activities at the construction project. Purpose of this method statement is to control the water flooding that may occur during commissioning activities.
Read Full Method Statement
This site hse procedure shall ensure safe and efficient operation of light vehicles movement of the organization. Safety instruction does not fully detail each specific requirement operators will encounter on their daily assignments. This guide provides competent light vehicle operators with critical
Read Full Method Statement
Table of Contents 1.0 Purpose 2.0 Scope 3.0 References 4.0 Definitions and Abbreviations 5.0 Responsibilities 6.0 Procedure 6.1 Notice of Meeting 6.2 Agenda and Attendance 6.3 Confirmation of Previous Minutes 6.4 Matters Arising (include Safety, Health and Environmental Audit Findings) 6.5 Safety
Read Full Method Statement
This repairing method statement applies to all concrete repair of the following types. Major Repair: For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete
Read Full Method Statement
This Method Statement outlines methodology and acceptable parameters for all activities for construction of Pile cap foundations for the project building. In addition this method covers types of plants and machinery, sequence and area of works, testing (Quality Control), health and safety.
Read Full Method Statement