Method Statement For Fluke Testing & Commissioning Of Telephone Data System
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Telephone Data System, Structured Cabling System through the guidelines contained herein so as to ensure that the electrical job execution complies with the project requirements and serves the intended function to satisfactory level of…
-
Testing & Commissioning of Sump Pump Sets
Below is a step wise method of statement for Testing & Commissioning of Sump Pump Sets. Precommissioning Procedure for Sump Pumps Ensure that the pump installation is complete and mechanical completion is approved. Ensure that no damage occurs between mechanical completion & precommissioning. Repair all damages to the equipment paint finish. Ensure that the pumps are identified location…
-
Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s
The purpose of this method statement is to define the step by step method to implement the correct practices for the Testing & Commissioning Of Starter Panels Variable Frequency Drives VFD’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. TOOLS /…
-
Staircase Pressurization System Testing & Commissioning Procedure
The purpose of this mechanical procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of staircase pressurization system through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function of HVAC ducting system…
-
Testing & Commissioning Of Split Air Conditioning AC Units
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Split AC Units through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Split A/C…
-
Method Statement For Testing & Commissioning of Smoke Extract Fans
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of Smoke Extract Fans through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Smoke Extract…
-
Testing & Commissioning Of Submain Distribution Boards SMDB’s
The purpose of this procedure is to define the step by step method to implement the correct practices for the precommissioning & commissioning of submain Distribution Boards SMDB’s through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools for SMDB…
-
Method Statement For Testing & Commissioning of Sanitary Wares
This method statement is to define the step by step procedure to implement the correct practices for the precommissioning & commissioning of Sanitary wares through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Precommissioning Procedure for Sanitary wares Ensure that the…
-
Testing & Commissioning Of Chilled Water Pressurization Units
The purpose of this procedure or safe work method of statement is to define the step by step method to implement the correct practices for the testing, precommissioning & commissioning of Pressurization units. Site team should follow through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the…
-
Space Noise Level Measurement Method Of Statement
The purpose of this method statement procedure is to define the step by step method to implement the correct practices for the Noise Level Measurement through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Checks prior to start of Noise Level…