Author Archives: Webmaster

Formwork Shuttering Installation Method of Statement

The purpose of this civil work method statement is to lay down the systematic procedures for the various activities required for reliable formwork to ensure that all works are carried out according to the designed drawings and Technical/Contract specifications. Scope of this method statement shall apply to all the Formworks/Shuttering at a construction project. The… Read More: Formwork Shuttering Installation Method of Statement »

Risk Assessment for Drainage Pipes Installation

Construction and HSE team must ensure that hazard identification is complete before start of the drainage piping work. The construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well established legal requirements, potentially high risks). Construction and HSE team to prepare the risk assessment… Read More: Risk Assessment for Drainage Pipes Installation »

Stainless Steel Piping Fabrication SS Piping Method Statement

The purpose of this piping fabrication procedure is to provide guidelines to carry out all the activities in a systematic way for fabrication and erection of stainless steel piping and to ensure that all concerned personnel have the common understanding to achieve the highest quality of workmanship and the safe execution of the ss piping… Read More: Stainless Steel Piping Fabrication SS Piping Method Statement »

Dozer Operation – Construction Equipment Safety Procedure

The purpose of this standard construction equipment safety procedure is to provide safe operating instructions for dozer operators working on any kind of construction or road projects. Project director is overall responsible for the implementation of this standard procedure. Authority to Operate a) All dozer operators must: i. hold a valid, project and equipment specific… Read More: Dozer Operation – Construction Equipment Safety Procedure »

Pump House / Pump Room Piping & Pumps Installation Method Statement

Purpose of this mechanical safework method of statement is to ensure that correct materials are used and agreed procedures are implemented during fabrication, welding, installation and testing of the pump room piping network. This method statement specifies the sequence and methodology for the installation and testing of piping to achieve the best quality of work.… Read More: Pump House / Pump Room Piping & Pumps Installation Method… »

Concrete & Paving Demolition Method Statement

The purpose of this safework method statement is to define the rules and conditions designed to ensure that concrete and paving demolition work is planned so as to enable personnel to be aware of all the procedures and dangers involved and to decide on the safest method of work. A detailed survey shall be conducted… Read More: Concrete & Paving Demolition Method Statement »

Construction of Bored Cast-in-Situ Piles Best Method Statement

Below is a brief safework method statement for bored piling that describes the whole construction procedures including material and equipment required for the construction of bored cast-in-situ piles. Detail of the procedures contained herein maybe reviewed periodically and modified based on actual project site requirements. The piles will be of a nominal specified diameter, bored… Read More: Construction of Bored Cast-in-Situ Piles Best Method Statement »