2019
Oct
21

Use of Series and Shunt Capacitors in Transmission Lines

Let’s first understand the effect of power factor on the power system. The power factor of an AC electric power system is defined to be; Power factor = π‘Ÿπ‘’π‘Žπ‘™ π‘π‘œπ‘€π‘’π‘Ÿ / π‘Žπ‘π‘π‘Žπ‘Ÿπ‘’π‘›π‘‘ π‘π‘œπ‘€π‘’π‘Ÿ Real power is the capacity of the circuit for

2019
Sep
21

Method of Testing & Commissioning of Structured Cabling System

Checklist for Testing & Commissioning of Structured Cabling System

The purpose of this method statement shall be to outline the sequence and method of Testing & Commissioning of Structured cabling system. This procedure is one component of a complete testing and commissioning program. This and other procedures will be used, as

2019
Jun
2

Steel Structure Fabrication and Metal Roofing Method Statement

metal roofing and steel structure fabrication method statement

This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure & decking slabs.Β The procedure shall be read in conjunction with contract specification wherever applicable.Β Purpose of this procedure is to define fabrication and installation of