Upon arrival at site, the Fire Fighting pumps shall be off-loaded carefully at site using necessary manpower and required equipment to ensure that no damage is caused. The Fire Fighting pumps shall be preferably shifted directly to the pump room immediately upon arrival at
Read Full Method Statement
Following tools or equipment shall be arranged for the installation of steam boiler. Fork lift or Crane with capacity & arrangement ( strap ) in line with manufacturer’s recommendations. Portable hand tools, Spirit Level / Level Threads Drill Machine / Hammering Machine MATERIAL
Read Full Method Statement
Below is step wise procedure or method statement for the installation of calorifier. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved
Read Full Method Statement
The purpose of this mechanical HVAC method statement is to elaborate various work procedures which explains and covers the ductwork installation of HVAC Supply / Return / Exhaust Ducts, Dampers, Fire Dampers and Access Doors. It is overall the responsibility of project
Read Full Method Statement
1. PURPOSE The purpose of generating this mechanical method statement is to define the procedure step by step to implement the correct practices for Installation, Pressure Testing, Insulation and cladding of Chilled Water Piping network including valves and accessories. Following the the
Read Full Method Statement