1. PURPOSE The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of LV Switchboards, MCC’s, Capacitor Banks, Variable Frequency Drive’s, SMDB’s & DB’s contained herein so as to ensure that the
Read Full Method Statement
1. PURPOSE The purpose of this Safe Work Method Statement is to define the procedure step by step to implement the correct practices for Installation of Lighting Control System through the guide line contained herein so as to ensure that the job execution complies
Read Full Method Statement
This Method Statement defines the procedure step by step to implement the correct practices for Installation of High Voltage HV Cable in order to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Required Tools For HV
Read Full Method Statement
Following tools shall be required for performing the installation of GI Conduits for electrical works. Portable hand tools. Portable Drilling Machine/ Grinding Machine Spirit Level Level Threads G.I. Conduit bending and threading equipment INSTALLATION PROCEDURE FOR INSTALLATION OF GI CONDUITS Ensure that
Read Full Method Statement
1. PURPOSE : The purpose of generating this Method Statement is to define the procedure step by step to implement the correct practices for Installation of Fire Alarm FA System through the guide line contained herein so as to ensure that the job execution
Read Full Method Statement