This page covers the method statement for the construction of plain cement concrete pavement in accordance with the drawings & specifications and in conformity with lines, grades and cross sections shown on the drawings. All the joint details shall be as per
Read Full Method Statement
Below is given a Safe work method statement for the installation of foundation waterproofing that can be applicable for safe working for any building or project construction. Ensure Material for water proofing material is approved prior to application. Ensure surface preparation is
Read Full Method Statement
Below is a simple to understand safe work method statement for the Demolition of Existing Boundary Wall before starting a new project or renovation works. No. Description of Activity Responsibility 1.0 Ensure all clearances from the concerned Government Department obtain PE/SE 2.0
Read Full Method Statement
Below is complete and simple to follow procedure for Safe Method Statement for Foundation Concreting Installation Works. Ensure all clearances from the concerned Government department obtained. Selected working area should be barricaded to avoid accidents & damages. Ensure suitable access / safe ramps
Read Full Method Statement
Hollow core slab production and installation method of statement is given below for your use as a sample for different projects. Ensure all clearances from the concerned government department obtained. Selected working area should be barricaded to avoid accidents & damages. Ensure
Read Full Method Statement