Slab Concrete Procedure for Ground Floor Slab

This civil construction procedure applies to insitu industrial ground floor slabs with a tolerance of± 3mm or tighter. Prior to placing subcontract concrete order check the specification to ensure the full extent of tolerances and surface finish is understood. Concrete pouring order to be placed only when all parties have agreed tolerances, method of checking… Read More: Slab Concrete Procedure for Ground Floor Slab »

Method Statement for Major and Minor Concrete Repair & Filling of Pinholes and Cracks

This repairing method statement applies to all concrete repair of the following types. Major Repair:  For all concrete repairs to be carried out as per manufacturer’s recommendations and shall be applied by trained personal as per consultant instructions. For all major concrete repairs should be supervised by specialist personal. For all major concrete repair works… Read More: Method Statement for Major and Minor Concrete Repair & Filling… »

Method of Statement for Construction Of Pilecap Foundations

This Method Statement outlines methodology and acceptable parameters for all activities for construction of Pile cap foundations for the project building. In addition this method covers types of plants and machinery, sequence and area of works, testing (Quality Control), health and safety. Plant and Machinery Excavator – 1 No. Crane – 1 No – wherever… Read More: Method of Statement for Construction Of Pilecap Foundations »

General Reinforced Cement Concrete (RCC) Work Method of Statement

The purpose of this safework method of statement is to provide a standardized framework for the control of cast-in place concrete, including formwork, reinforcing operations to ensure compliance with the project requirements. Method statement is applicable to all cast-in place concrete, including formwork, reinforcing to permanent and temporary structures. HSE engineer will ensure that the… Read More: General Reinforced Cement Concrete (RCC) Work Method of Statement »

Access Scaffolding / Scaffold Tower Installation and Assembly Method Statement

Purpose of this safety method statement is to define the procedure for the installation of access scaffolding including scaffold tower. The scope of this method statement is for the installation of the scaffolding on to the external façade of the project only. Following material and equipment is necessary for the work: JCB Bobcat Telehandler Hammer Spanner… Read More: Access Scaffolding / Scaffold Tower Installation and Assembly Method Statement »

Safety Procedure for Safe Operation of Earthmoving Plant and Machinery

The procedure below covers the Hazard Identification and Risk Assessment that involves on the project sites related with the operation and maintenance of heavy earth moving plant and machineries. Earthmoving usually involves the operation of large, heavy and cumbersome vehicles in an environment easily affected by the weather. Rainwater can soon change dry and dusty… Read More: Safety Procedure for Safe Operation of Earthmoving Plant and Machinery »

Method Statement for External Protective Coating of Steel Pipes and Fitting Joints

This document covers works for the external coating of steel pipes and fitting joints and tests along with a recommendation of generic material types. All the inspection will be performed in accordance with the ITP for field external coating roof steel pipe fittings and joints. Inspections should be performed by QC inspectors who are certified… Read More: Method Statement for External Protective Coating of Steel Pipes and… »